• English
  • 中文
  • Français
  • Deutsch
  • Español
Contact Us
Home
Email
Follow Prosoft Technology on Twitter
Follow Prosoft Technology on Facebook
Follow Prosoft Technology on LinkedIn
Follow Prosoft Technology on YouTube
    • PROFINET Controller Module for ControlLogix®
    • EtherNet/IP™ to DH+ Gateway
    • Universal QuickServer Gateway
  • Solutions
    • Amusement
    • Automated Material Handling
    • 汽车解决方案
    • IIoT Solutions
    • Knowledge Base

      Categories

      • Gateways
      • Rockwell In-chassis
      • Schneider In-chassis
      • Wireless
      • Accessories
      • Protocols
      • Software
      • Legacy Products
      • Certifications
      • Technical Support
      • Miscellaneous

      What do you need help with?

      My RLXIB-IHW radio does not seemed to be working at 5GHz. How do I fix it?

      If you are using a RadioLinx RLXIB-IHW radio with firmware revision 2.073 and set it to operate at 5GHz, there is a known issue in this version of firmware that causes the transmit power to drop ... My RLXIB-IHW radio does not seemed to be working at 5GHz. How do I fix it?

      Read more

      In the IEC 60870-5-104 protocol, what is the purpose of the "RESET_PROCESS" command, "C_RP_NC_1"; and what does it do?

      The Reset_Process command is defined in Section 7.1 of the IEC-870-5-104 protocol specification document, the section covering Station Initialization. This command is used as part of the connection ... IEC, 60870, IEC-870-5-104, 104S ... In the IEC 60870-5-104 protocol, what is the purpose of the "RESET_PROCESS" command, "C_RP_NC_1"; and what does it do?

      Read more

      How do I change the name and address of the Site Operator in my Opacts/TermLinx application?

      the active site as usual. (2) Menu (3) In the window that opens, click "find". (4) In the list to the left, click (highlight) the entry that represents your site (5) In the panel to the right, note

      Read more

      What do the QuickServer LEDs indicate?

      in this manner. ERR - This LED will become active during power up temporarily, but should be off within about 5 seconds. If it does not turn off, or if it comes on at any point during normal operation and remains

      Read more

      How do I control Binary Outputs Using the MVI56E-DNPNET Module?

      _Address 5 DNPNET.CONTROL.CROB_Commands.CROB_Commands[0].Object 12 DNPNET.CONTROL.CROB_Commands.CROB_Commands[0].Variation 1 DNPNET

      Read more
      • «
      • 7
      • 8
      • 9
      • 10
      • 11
      • »

Solutions

  • Amusement
  • Automated Material Handling
  • 汽车解决方案
  • IIoT Solutions
  • Mining and Metals
  • Modernization
  • Oil and Gas Solutions
  • Secure Remote Connectivity
  • Water / Wastewater

产品

  • 远程访问
  • 罗克韦尔自动化机架内产品
  • 网关
  • 工业无线设备
  • ProSoft 软件

服务与支持

  • Knowledge Base
  • 区域技术支持
  • 下载
  • 培训
  • Return Material Instructions
  • 资料索取

新闻与活动

  • ProSoft Insights (Blog)
  • Podcast
  • 成功案例
  • 新闻发布
  • ProSoft 杂志
  • 重要活动

怎样购买

  • 经销商

关于我们