The AGA Specifications include Part 1 "General Equations and Uncertainty Guidelines", dated 1990; Part 2 "Specification and Installation Requirements", dated 2000; Part 3 "Natural Gas Applications
Read moreprocedure to close an open socket connection. On page 45 of the protocol specification, it describes the process as: Figure 20 shows the controlling station establishing a connection by giving an Active
Read morethe active site as usual. (2) Menu (3) In the window that opens, click "find". (4) In the list to the left, click (highlight) the entry that represents your site (5) In the panel to the right, note
Read more, but if it is a major one, it may require repair of the unit, so a Support Engineer will be needed to help determine the degree of the error. TX/RX - These LEDs are connected to the R2 serial port (the bottom serial
Read more) DNPNET.CONTROL.CROB_Commands.CROB_Commands[0].Pulse_Off 1 (milliseconds) However Control_Code will be specific to each CROB function: Trip: 2
Read more